Dealing with construction permits: Time in Samoa
Samoa: Dealing with construction permits: Time was 57 days in 2019. ▬ Flat
Dealing with construction permits: Time in Samoa, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Samoa is 57 days, measured in 2019. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Samoa peaked at 57 days in 2005 and was at its lowest, 57 days, in 2005.
Samoa ranks 180th of 185 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 57 days | 57 days | 57 days | 5 |
| 2010s | 57 days | 57 days | 57 days | 10 |
Countries ranked near Samoa
More private sector data for Samoa
- Merchandise trade 38.1% (2025)
- Food imports 29.6% (2024)
- Manufactures imports 48.0% (2024)
- Merchandise imports 467.00 million current US$ (2025)
- Food exports 24.8% (2024)
- Manufactures exports 39.4% (2024)
- Merchandise exports 24.00 million current US$ (2025)
- Commercial service exports 328.00 million current US$ (2025)
- Transport services 44.9% (2025)
- Computer, communications and other services 31.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Samoa?
- Dealing with construction permits: time in Samoa was 57 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Samoa?
- The highest recorded value was 57 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Samoa?
- The lowest recorded value was 57 days in 2005.
- How does Samoa rank for dealing with construction permits: time?
- Samoa ranks 180th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Samoa?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Samoa data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.