Marshall Islands vs United Arab Emirates: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Marshall Islands
- United Arab Emirates
How they compare
United Arab Emirates currently reports 47.5 days against 38 days in Marshall Islands, a difference of 9.5 days.
That makes United Arab Emirates's figure about 1.2 times Marshall Islands's.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was United Arab Emirates ahead.
Marshall Islands ranks 183rd and United Arab Emirates ranks 181st of 185 countries.
United Arab Emirates has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Marshall Islands | United Arab Emirates | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 53 days | 76.1 days | 23.1 days | United Arab Emirates |
| 2010s | 41 days | 48.25 days | 7.25 days | United Arab Emirates |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Marshall Islands or United Arab Emirates?
- United Arab Emirates, at 47.5 days against 38 days in Marshall Islands as of 2019.
- What is the difference in dealing with construction permits: time between Marshall Islands and United Arab Emirates?
- 9.5 days, with United Arab Emirates ahead.
- How many years of comparable data are there for Marshall Islands and United Arab Emirates?
- 15 years are reported by both, from 2005 to 2019.
- How do Marshall Islands and United Arab Emirates rank globally for dealing with construction permits: time?
- Marshall Islands ranks 183rd and United Arab Emirates ranks 181st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.