Dealing with construction permits: Time in United Arab Emirates
United Arab Emirates: Dealing with construction permits: Time was 47.5 days in 2019. ▼ Falling
Dealing with construction permits: Time in United Arab Emirates, 2005–2019
Source: World Bank. Measured in days.
Analysis
United Arab Emirates recorded 47.5 days for dealing with construction permits: time in 2019.
That represents a change of down 5.9% on the previous year and down 2.1% over ten years.
Over the whole period, dealing with construction permits: time in United Arab Emirates peaked at 83 days in 2005 and was at its lowest, 46.5 days, in 2012.
United Arab Emirates ranks 181st of 185 countries on this measure, in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 76.1 days | 48.5 days | 83 days | 5 |
| 2010s | 48.25 days | 46.5 days | 52 days | 10 |
Countries ranked near United Arab Emirates
More private sector data for United Arab Emirates
- Merchandise trade 208.2% (2024)
- Food imports 5.0% (2023)
- Manufactures imports 54.9% (2023)
- Merchandise imports 618.88 billion current US$ (2025)
- Food exports 2.9% (2023)
- Manufactures exports 8.8% (2023)
- Merchandise exports 706.67 billion current US$ (2025)
- Merchandise imports from economies in the Arab World 8.3% (2023)
- Merchandise imports from high-income economies 40.3% (2023)
- Merchandise imports from low- and middle-income economies outside regi 56.4% (2023)
Frequently asked questions
- What is dealing with construction permits: time in United Arab Emirates?
- Dealing with construction permits: time in United Arab Emirates was 47.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in United Arab Emirates?
- The highest recorded value was 83 days in 2005.
- What is the lowest dealing with construction permits: time recorded in United Arab Emirates?
- The lowest recorded value was 46.5 days in 2012.
- How does United Arab Emirates rank for dealing with construction permits: time?
- United Arab Emirates ranks 181st out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in United Arab Emirates?
- Over the last ten years it is down 2.1%. The long-run trend across the full record is falling.
- Where does this United Arab Emirates data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.