Dealing with construction permits: Time (days) (Time days) in United Arab Emirates

United Arab Emirates: Dealing with construction permits: Time was 47.5 days in 2019. ▼ Falling

Latest (2019)
47.5 days
Change on year
down 5.9%
World rank
184th
of 188 countries
All-time high
83 days
in 2005
All-time low
46.5 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in United Arab Emirates, 2005–2019

0204060802005201220192005: 83 days2006: 83 days2007: 83 days2008: 83 days2009: 48.5 days2010: 48.5 days2011: 47.5 days2012: 46.5 days2013: 46.5 days2014: 46.5 days2015: 46.5 days2016: 52 days2017: 50.5 days2018: 50.5 days2019: 47.5 days

Source: World Bank. Measured in days.

Analysis

United Arab Emirates recorded 47.5 days for dealing with construction permits: time in 2019.

That represents a change of down 5.9% on the previous year and down 2.1% over ten years.

Over the whole period, dealing with construction permits: time in United Arab Emirates peaked at 83 days in 2005 and was at its lowest, 46.5 days, in 2012.

United Arab Emirates ranks 184th of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in United Arab Emirates, year by year

Annual values for Dealing with construction permits: Time (days) in United Arab Emirates, 2005 to 2019.
Year days Change
2005 83 days —
2006 83 days +0.0%
2007 83 days +0.0%
2008 83 days +0.0%
2009 48.5 days -41.6%
2010 48.5 days +0.0%
2011 47.5 days -2.1%
2012 46.5 days -2.1%
2013 46.5 days +0.0%
2014 46.5 days +0.0%
2015 46.5 days +0.0%
2016 52 days +11.8%
2017 50.5 days -2.9%
2018 50.5 days +0.0%
2019 47.5 days -5.9%

United Arab Emirates compared with similar countries

  • United Arab Emirates's 47.5 days is below the median for high income countries, which is 144.75 days, 33% of the median. (62 countries reporting)
  • United Arab Emirates's 47.5 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 37% of the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 76.1 days 48.5 days 83 days 5
2010s 48.25 days 46.5 days 52 days 10

Countries ranked near United Arab Emirates

  1. 181 Georgia 63 days compare
  2. 182 Morocco 58 days compare
  3. 183 Samoa 57 days compare
  4. 185 Malaysia 41 days compare
  5. 186 Marshall Islands 38 days compare
  6. 187 Singapore 35.5 days compare

See the full ranking of 188 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is dealing with construction permits: time in United Arab Emirates?
Dealing with construction permits: time in United Arab Emirates was 47.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in United Arab Emirates?
The highest recorded value was 83 days in 2005.
What is the lowest dealing with construction permits: time recorded in United Arab Emirates?
The lowest recorded value was 46.5 days in 2012.
How does United Arab Emirates rank for dealing with construction permits: time?
United Arab Emirates ranks 184th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in United Arab Emirates?
Over the last ten years it is down 2.1%. The long-run trend across the full record is falling.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in United Arab Emirates. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/united-arab-emirates/">Dealing with construction permits: Time in United Arab Emirates</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.