Dealing with construction permits: Time in United Arab Emirates

United Arab Emirates: Dealing with construction permits: Time was 47.5 days in 2019. ▼ Falling

Latest (2019)
47.5 days
Change on year
down 5.9%
World rank
181st
of 185 countries
All-time high
83 days
in 2005
All-time low
46.5 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in United Arab Emirates, 2005–2019

0204060802005201220192005: 83 days2006: 83 days2007: 83 days2008: 83 days2009: 48.5 days2010: 48.5 days2011: 47.5 days2012: 46.5 days2013: 46.5 days2014: 46.5 days2015: 46.5 days2016: 52 days2017: 50.5 days2018: 50.5 days2019: 47.5 days

Source: World Bank. Measured in days.

Analysis

United Arab Emirates recorded 47.5 days for dealing with construction permits: time in 2019.

That represents a change of down 5.9% on the previous year and down 2.1% over ten years.

Over the whole period, dealing with construction permits: time in United Arab Emirates peaked at 83 days in 2005 and was at its lowest, 46.5 days, in 2012.

United Arab Emirates ranks 181st of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 76.1 days 48.5 days 83 days 5
2010s 48.25 days 46.5 days 52 days 10

Countries ranked near United Arab Emirates

  1. 178 Georgia 63 days compare
  2. 179 Morocco 58 days compare
  3. 180 Samoa 57 days compare
  4. 182 Malaysia 41 days compare
  5. 183 Marshall Islands 38 days compare
  6. 184 Singapore 35.5 days compare

See the full ranking of 187 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is dealing with construction permits: time in United Arab Emirates?
Dealing with construction permits: time in United Arab Emirates was 47.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in United Arab Emirates?
The highest recorded value was 83 days in 2005.
What is the lowest dealing with construction permits: time recorded in United Arab Emirates?
The lowest recorded value was 46.5 days in 2012.
How does United Arab Emirates rank for dealing with construction permits: time?
United Arab Emirates ranks 181st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in United Arab Emirates?
Over the last ten years it is down 2.1%. The long-run trend across the full record is falling.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.