Mauritania vs Nigeria: Dealing with construction permits: Time

Mauritania
104 days
in 2019
Nigeria
104.79 days
in 2019
Mauritania rank
133rd
Nigeria rank
132nd

Dealing with construction permits: Time over time

  • Mauritania
  • Nigeria
050100150200520122019

How they compare

Nigeria currently reports 104.79 days against 104 days in Mauritania, a difference of 0.79 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Mauritania ahead.

Mauritania ranks 133rd and Nigeria ranks 132nd of 185 countries.

Across the 2 decades both report, Mauritania averaged higher in 1 and Nigeria in 1.

Head to head by decade

Decade Mauritania Nigeria Difference Ahead
2000s 153 days 124 days 29 days Mauritania
2010s 108.9 days 110.55 days 1.65 days Nigeria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mauritania or Nigeria?
Nigeria, at 104.79 days against 104 days in Mauritania as of 2019.
What is the difference in dealing with construction permits: time between Mauritania and Nigeria?
0.79 days, with Nigeria ahead.
How many years of comparable data are there for Mauritania and Nigeria?
15 years are reported by both, from 2005 to 2019.
How do Mauritania and Nigeria rank globally for dealing with construction permits: time?
Mauritania ranks 133rd and Nigeria ranks 132nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.