Dealing with construction permits: Time (days) (Time days) in Mauritania

Mauritania: Dealing with construction permits: Time was 104 days in 2019. ▼ Falling

Latest (2019)
104 days
Change on year
unchanged
World rank
136th
of 188 countries
All-time high
153 days
in 2005
All-time low
104 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Mauritania, 2005–2019

0501001502005201220192005: 153 days2006: 153 days2007: 153 days2008: 153 days2009: 153 days2010: 153 days2011: 104 days2012: 104 days2013: 104 days2014: 104 days2015: 104 days2016: 104 days2017: 104 days2018: 104 days2019: 104 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Mauritania is 104 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 32.0% over ten years.

Over the whole period, dealing with construction permits: time in Mauritania peaked at 153 days in 2005 and was at its lowest, 104 days, in 2011.

That places Mauritania 136th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Mauritania, year by year

Annual values for Dealing with construction permits: Time (days) in Mauritania, 2005 to 2019.
Year days Change
2005 153 days —
2006 153 days +0.0%
2007 153 days +0.0%
2008 153 days +0.0%
2009 153 days +0.0%
2010 153 days +0.0%
2011 104 days -32.0%
2012 104 days +0.0%
2013 104 days +0.0%
2014 104 days +0.0%
2015 104 days +0.0%
2016 104 days +0.0%
2017 104 days +0.0%
2018 104 days +0.0%
2019 104 days +0.0%

Mauritania compared with similar countries

  • Mauritania's 104 days is below the median for lower middle income countries, which is 159 days, 65% of the median. (47 countries reporting)
  • Mauritania's 104 days is below the median for Sub-Saharan Africa, which is 143.5 days, 72% of the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 153 days 153 days 153 days 5
2010s 108.9 days 104 days 153 days 10

Countries ranked near Mauritania

  1. 133 Panama 105 days compare
  2. 133 Saint Kitts and Nevis 105 days compare
  3. 135 Nigeria 104.79 days compare
  4. 137 Estonia 103 days compare
  5. 137 Kuwait 103 days compare
  6. 139 Kazakhstan 102.5 days compare

See the full ranking of 188 places →

More private sector data for Mauritania

All data for Mauritania →

Frequently asked questions

What is dealing with construction permits: time in Mauritania?
Dealing with construction permits: time in Mauritania was 104 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Mauritania?
The highest recorded value was 153 days in 2005.
What is the lowest dealing with construction permits: time recorded in Mauritania?
The lowest recorded value was 104 days in 2011.
How does Mauritania rank for dealing with construction permits: time?
Mauritania ranks 136th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Mauritania?
Over the last ten years it is down 32.0%. The long-run trend across the full record is falling.
Where does this Mauritania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Mauritania. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/mauritania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/mauritania/">Dealing with construction permits: Time in Mauritania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.