Mozambique vs Sweden: Dealing with construction permits: Time

Mozambique
118 days
in 2019
Sweden
117 days
in 2019
Mozambique rank
115th
Sweden rank
117th

Dealing with construction permits: Time over time

  • Mozambique
  • Sweden
050100150200250200520122019

How they compare

Mozambique currently reports 118 days against 117 days in Sweden, a difference of 1 days.

Across all 15 years both countries report, Mozambique has been ahead every year.

Mozambique ranks 115th and Sweden ranks 117th of 185 countries.

Mozambique has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mozambique Sweden Difference Ahead
2000s 242 days 147 days 95 days Mozambique
2010s 159 days 123 days 36 days Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mozambique or Sweden?
Mozambique, at 118 days against 117 days in Sweden as of 2019.
What is the difference in dealing with construction permits: time between Mozambique and Sweden?
1 days, with Mozambique ahead.
How many years of comparable data are there for Mozambique and Sweden?
15 years are reported by both, from 2005 to 2019.
How do Mozambique and Sweden rank globally for dealing with construction permits: time?
Mozambique ranks 115th and Sweden ranks 117th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.