Dealing with construction permits: Time in Mozambique
Mozambique: Dealing with construction permits: Time was 118 days in 2019. ▼ Falling
Dealing with construction permits: Time in Mozambique, 2005–2019
Source: World Bank. Measured in days.
Analysis
Mozambique recorded 118 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
The figure is down 51.2% over ten years.
Over the whole period, dealing with construction permits: time in Mozambique peaked at 242 days in 2005 and was at its lowest, 118 days, in 2015.
That places Mozambique 115th out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 242 days | 242 days | 242 days | 5 |
| 2010s | 159 days | 118 days | 242 days | 10 |
Countries ranked near Mozambique
- 113 Australia 120.5 days compare
- 114 Philippines 120 days compare
- 115 Nepal 118 days compare
- 117 Sweden 117 days compare
- 118 Azerbaijan 116 days compare
- 118 Eswatini 116 days compare
- 118 Saint Lucia 116 days compare
More private sector data for Mozambique
- Merchandise trade 77.5% (2025)
- Food imports 19.6% (2024)
- Manufactures imports 56.0% (2024)
- Merchandise imports 9.21 billion current US$ (2025)
- Food exports 12.3% (2024)
- Manufactures exports 4.6% (2024)
- Merchandise exports 8.10 billion current US$ (2025)
- Commercial service exports 1.15 billion current US$ (2024)
- Transport services 38.1% (2024)
- Computer, communications and other services 47.5% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Mozambique?
- Dealing with construction permits: time in Mozambique was 118 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Mozambique?
- The highest recorded value was 242 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Mozambique?
- The lowest recorded value was 118 days in 2015.
- How does Mozambique rank for dealing with construction permits: time?
- Mozambique ranks 115th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Mozambique?
- Over the last ten years it is down 51.2%. The long-run trend across the full record is falling.
- Where does this Mozambique data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.