Dealing with construction permits: Time in Mozambique

Mozambique: Dealing with construction permits: Time was 118 days in 2019. ▼ Falling

Latest (2019)
118 days
Change on year
unchanged
World rank
115th
of 185 countries
All-time high
242 days
in 2005
All-time low
118 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Mozambique, 2005–2019

0501001502002502005201220192005: 242 days2006: 242 days2007: 242 days2008: 242 days2009: 242 days2010: 242 days2011: 242 days2012: 242 days2013: 137 days2014: 137 days2015: 118 days2016: 118 days2017: 118 days2018: 118 days2019: 118 days

Source: World Bank. Measured in days.

Analysis

Mozambique recorded 118 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 51.2% over ten years.

Over the whole period, dealing with construction permits: time in Mozambique peaked at 242 days in 2005 and was at its lowest, 118 days, in 2015.

That places Mozambique 115th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 242 days 242 days 242 days 5
2010s 159 days 118 days 242 days 10

Countries ranked near Mozambique

  1. 113 Australia 120.5 days compare
  2. 114 Philippines 120 days compare
  3. 115 Nepal 118 days compare
  4. 117 Sweden 117 days compare
  5. 118 Azerbaijan 116 days compare
  6. 118 Eswatini 116 days compare
  7. 118 Saint Lucia 116 days compare

See the full ranking of 187 places →

More private sector data for Mozambique

All data for Mozambique →

Frequently asked questions

What is dealing with construction permits: time in Mozambique?
Dealing with construction permits: time in Mozambique was 118 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Mozambique?
The highest recorded value was 242 days in 2005.
What is the lowest dealing with construction permits: time recorded in Mozambique?
The lowest recorded value was 118 days in 2015.
How does Mozambique rank for dealing with construction permits: time?
Mozambique ranks 115th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Mozambique?
Over the last ten years it is down 51.2%. The long-run trend across the full record is falling.
Where does this Mozambique data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.