Nepal vs Philippines: Dealing with construction permits: Time

Nepal
118 days
in 2019
Philippines
120 days
in 2019
Nepal rank
115th
Philippines rank
114th

Dealing with construction permits: Time over time

  • Nepal
  • Philippines
050100150200520122019

How they compare

Philippines currently reports 120 days against 118 days in Nepal, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Nepal ahead.

Nepal ranks 115th and Philippines ranks 114th of 185 countries.

Across the 2 decades both report, Nepal averaged higher in 1 and Philippines in 1.

Head to head by decade

Decade Nepal Philippines Difference Ahead
2000s 148 days 128.8 days 19.2 days Nepal
2010s 112.2 days 123.8 days 11.6 days Philippines

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Nepal or Philippines?
Philippines, at 120 days against 118 days in Nepal as of 2019.
What is the difference in dealing with construction permits: time between Nepal and Philippines?
2 days, with Philippines ahead.
How many years of comparable data are there for Nepal and Philippines?
15 years are reported by both, from 2005 to 2019.
How do Nepal and Philippines rank globally for dealing with construction permits: time?
Nepal ranks 115th and Philippines ranks 114th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.