Dealing with construction permits: Time (days) (Time days) in Philippines

Philippines: Dealing with construction permits: Time was 120 days in 2019. ▼ Falling

Latest (2019)
120 days
Change on year
down 1.6%
World rank
117th
of 188 countries
All-time high
129 days
in 2006
All-time low
120 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Philippines, 2005–2019

0501001502005201220192005: 128 days2006: 129 days2007: 129 days2008: 129 days2009: 129 days2010: 129 days2011: 129 days2012: 128 days2013: 122 days2014: 122 days2015: 122 days2016: 122 days2017: 122 days2018: 122 days2019: 120 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Philippines stood at 120 days. That is the lowest value across all 15 years on record.

The figure is down 1.6% on the previous year and down 7.0% over ten years.

Over the whole period, dealing with construction permits: time in Philippines peaked at 129 days in 2006 and was at its lowest, 120 days, in 2019.

Philippines ranks 117th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Philippines, year by year

Annual values for Dealing with construction permits: Time (days) in Philippines, 2005 to 2019.
Year days Change
2005 128 days —
2006 129 days +0.8%
2007 129 days +0.0%
2008 129 days +0.0%
2009 129 days +0.0%
2010 129 days +0.0%
2011 129 days +0.0%
2012 128 days -0.8%
2013 122 days -4.7%
2014 122 days +0.0%
2015 122 days +0.0%
2016 122 days +0.0%
2017 122 days +0.0%
2018 122 days +0.0%
2019 120 days -1.6%

Philippines compared with similar countries

  • Philippines's 120 days is below the median for upper middle income countries, which is 131 days, 92% of the median. (55 countries reporting)
  • Philippines's 120 days is above the median for East Asia & Pacific, which is 103.67 days, 1.2× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 128.8 days 128 days 129 days 5
2010s 123.8 days 120 days 129 days 10

Countries ranked near Philippines

  1. 114 Burkina Faso 121 days compare
  2. 114 Paraguay 121 days compare
  3. 116 Australia 120.5 days compare
  4. 118 Mozambique 118 days compare
  5. 118 Nepal 118 days compare
  6. 120 Sweden 117 days compare

See the full ranking of 188 places →

More private sector data for Philippines

All data for Philippines →

Frequently asked questions

What is dealing with construction permits: time in Philippines?
Dealing with construction permits: time in Philippines was 120 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Philippines?
The highest recorded value was 129 days in 2006.
What is the lowest dealing with construction permits: time recorded in Philippines?
The lowest recorded value was 120 days in 2019.
How does Philippines rank for dealing with construction permits: time?
Philippines ranks 117th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Philippines?
Over the last ten years it is down 7.0%. The long-run trend across the full record is falling.
Where does this Philippines data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Philippines. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/philippines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/philippines/">Dealing with construction permits: Time in Philippines</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.