Nepal vs Saint Lucia: Dealing with construction permits: Time (days) (Time days)

Nepal
118 days
in 2019
Saint Lucia
116 days
in 2019
Nepal rank
118th
Saint Lucia rank
121st

Dealing with construction permits: Time (days) (Time days) over time

  • Nepal
  • Saint Lucia
050100150200520122019

How they compare

Nepal currently reports 118 days against 116 days in Saint Lucia, a difference of 2 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Nepal ahead.

Nepal ranks 118th and Saint Lucia ranks 121st of 188 countries.

Across the 2 decades both report, Nepal averaged higher in 1 and Saint Lucia in 1.

Head to head by decade

Decade Nepal Saint Lucia Difference Ahead
2000s 148 days 135.8 days 12.2 days Nepal
2010s 112.2 days 116 days 3.8 days Saint Lucia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Nepal or Saint Lucia?
Nepal, at 118 days against 116 days in Saint Lucia as of 2019.
What is the difference in dealing with construction permits: time between Nepal and Saint Lucia?
2 days, with Nepal ahead.
How many years of comparable data are there for Nepal and Saint Lucia?
15 years are reported by both, from 2005 to 2019.
How do Nepal and Saint Lucia rank globally for dealing with construction permits: time?
Nepal ranks 118th and Saint Lucia ranks 121st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Nepal vs Saint Lucia: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/nepal/st-lucia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/nepal/st-lucia/">Nepal vs Saint Lucia: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.