Dealing with construction permits: Time (days) (Time days) in Saint Lucia

Saint Lucia: Dealing with construction permits: Time was 116 days in 2019. ▼ Falling

Latest (2019)
116 days
Change on year
unchanged
World rank
121st
of 188 countries
All-time high
149 days
in 2005
All-time low
116 days
in 2008
Years of data
15
2005–2019

Dealing with construction permits: Time in Saint Lucia, 2005–2019

0501001502005201220192005: 149 days2006: 149 days2007: 149 days2008: 116 days2009: 116 days2010: 116 days2011: 116 days2012: 116 days2013: 116 days2014: 116 days2015: 116 days2016: 116 days2017: 116 days2018: 116 days2019: 116 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Saint Lucia is 116 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Saint Lucia peaked at 149 days in 2005 and was at its lowest, 116 days, in 2008.

That places Saint Lucia 121st out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Saint Lucia, year by year

Annual values for Dealing with construction permits: Time (days) in Saint Lucia, 2005 to 2019.
Year days Change
2005 149 days —
2006 149 days +0.0%
2007 149 days +0.0%
2008 116 days -22.1%
2009 116 days +0.0%
2010 116 days +0.0%
2011 116 days +0.0%
2012 116 days +0.0%
2013 116 days +0.0%
2014 116 days +0.0%
2015 116 days +0.0%
2016 116 days +0.0%
2017 116 days +0.0%
2018 116 days +0.0%
2019 116 days +0.0%

Saint Lucia compared with similar countries

  • Saint Lucia's 116 days is below the median for upper middle income countries, which is 131 days, 89% of the median. (55 countries reporting)
  • Saint Lucia's 116 days is below the median for Latin America & Caribbean, which is 165 days, 70% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 135.8 days 116 days 149 days 5
2010s 116 days 116 days 116 days 10

Countries ranked near Saint Lucia

  1. 118 Mozambique 118 days compare
  2. 118 Nepal 118 days compare
  3. 120 Sweden 117 days compare
  4. 121 Azerbaijan 116 days compare
  5. 121 Eswatini 116 days compare
  6. 124 Seychelles 113 days compare
  7. 124 Thailand 113 days compare
  8. 124 Uganda 113 days compare

See the full ranking of 188 places →

More private sector data for Saint Lucia

All data for Saint Lucia →

Frequently asked questions

What is dealing with construction permits: time in Saint Lucia?
Dealing with construction permits: time in Saint Lucia was 116 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Saint Lucia?
The highest recorded value was 149 days in 2005.
What is the lowest dealing with construction permits: time recorded in Saint Lucia?
The lowest recorded value was 116 days in 2008.
How does Saint Lucia rank for dealing with construction permits: time?
Saint Lucia ranks 121st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Saint Lucia?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Saint Lucia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Saint Lucia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/st-lucia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/st-lucia/">Dealing with construction permits: Time in Saint Lucia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.