Niger vs Rwanda: Dealing with construction permits: Time (days) (Time days)

Niger
98 days
in 2019
Rwanda
97 days
in 2019
Niger rank
148th
Rwanda rank
149th

Dealing with construction permits: Time (days) (Time days) over time

  • Niger
  • Rwanda
100150200250300350200520122019

How they compare

Niger currently reports 98 days against 97 days in Rwanda, a difference of 1 days.

The two have swapped places 4 times across 15 shared years of data; in 2005 it was Niger ahead.

Niger ranks 148th and Rwanda ranks 149th of 188 countries.

Niger has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Niger Rwanda Difference Ahead
2000s 317 days 227.2 days 89.8 days Niger
2010s 163.9 days 125.6 days 38.3 days Niger

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Niger or Rwanda?
Niger, at 98 days against 97 days in Rwanda as of 2019.
What is the difference in dealing with construction permits: time between Niger and Rwanda?
1 days, with Niger ahead.
How many years of comparable data are there for Niger and Rwanda?
15 years are reported by both, from 2005 to 2019.
How do Niger and Rwanda rank globally for dealing with construction permits: time?
Niger ranks 148th and Rwanda ranks 149th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Niger vs Rwanda: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/niger/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/niger/rwanda/">Niger vs Rwanda: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.