Dealing with construction permits: Time in Niger
Niger: Dealing with construction permits: Time was 98 days in 2019. ▼ Falling
Dealing with construction permits: Time in Niger, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Niger stood at 98 days. That is the lowest value across all 15 years on record.
That represents a change of down 68.9% over ten years.
Over the whole period, dealing with construction permits: time in Niger peaked at 325 days in 2005 and was at its lowest, 98 days, in 2017.
Niger ranks 145th of 185 countries on this measure, in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 317 days | 315 days | 325 days | 5 |
| 2010s | 163.9 days | 98 days | 315 days | 10 |
Countries ranked near Niger
More private sector data for Niger
- Merchandise trade 21.3% (2025)
- Food imports 37.9% (2024)
- Manufactures imports 47.5% (2024)
- Merchandise imports 2.70 billion current US$ (2025)
- Food exports 4.1% (2024)
- Manufactures exports 7.3% (2024)
- Merchandise exports 1.90 billion current US$ (2025)
- Commercial service exports 221.76 million current US$ (2024)
- Transport services 57.7% (2024)
- Computer, communications and other services 32.0% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Niger?
- Dealing with construction permits: time in Niger was 98 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Niger?
- The highest recorded value was 325 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Niger?
- The lowest recorded value was 98 days in 2017.
- How does Niger rank for dealing with construction permits: time?
- Niger ranks 145th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Niger?
- Over the last ten years it is down 68.9%. The long-run trend across the full record is falling.
- Where does this Niger data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.