Norway vs Palestine, State of: Dealing with construction permits: Time

Norway
109.5 days
in 2019
Palestine, State of
108 days
in 2019
Norway rank
128th
Palestine, State of rank
130th

Dealing with construction permits: Time over time

  • Norway
  • Palestine, State of
050100150200250200520122019

How they compare

Norway currently reports 109.5 days against 108 days in Palestine, State of, a difference of 1.5 days.

Across all 15 years both countries report, Norway has been ahead every year.

Norway ranks 128th and Palestine, State of ranks 130th of 188 countries.

Norway has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Norway Palestine, State of Difference Ahead
2000s 235.5 days 109 days 126.5 days Norway
2010s 134.7 days 108.5 days 26.2 days Norway

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Norway or Palestine, State of?
Norway, at 109.5 days against 108 days in Palestine, State of as of 2019.
What is the difference in dealing with construction permits: time between Norway and Palestine, State of?
1.5 days, with Norway ahead.
How many years of comparable data are there for Norway and Palestine, State of?
15 years are reported by both, from 2005 to 2019.
How do Norway and Palestine, State of rank globally for dealing with construction permits: time?
Norway ranks 128th and Palestine, State of ranks 130th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Norway vs Palestine, State of: Dealing with construction permits: Time. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/norway/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/norway/west-bank-and-gaza/">Norway vs Palestine, State of: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.