Panama vs Palestine, State of: Dealing with construction permits: Time

Panama
105 days
in 2019
Palestine, State of
108 days
in 2019
Panama rank
132nd
Palestine, State of rank
129th

Dealing with construction permits: Time over time

  • Panama
  • Palestine, State of
050100150200520122019

How they compare

Palestine, State of currently reports 108 days against 105 days in Panama, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Panama ahead.

Panama ranks 132nd and Palestine, State of ranks 129th of 187 countries.

Across the 2 decades both report, Panama averaged higher in 1 and Palestine, State of in 1.

Head to head by decade

Decade Panama Palestine, State of Difference Ahead
2000s 141.2 days 109 days 32.2 days Panama
2010s 107.8 days 108.5 days 0.7 days Palestine, State of

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Panama or Palestine, State of?
Palestine, State of, at 108 days against 105 days in Panama as of 2019.
What is the difference in dealing with construction permits: time between Panama and Palestine, State of?
3 days, with Palestine, State of ahead.
How many years of comparable data are there for Panama and Palestine, State of?
15 years are reported by both, from 2005 to 2019.
How do Panama and Palestine, State of rank globally for dealing with construction permits: time?
Panama ranks 132nd and Palestine, State of ranks 129th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Panama vs Palestine, State of: Dealing with construction permits: Time. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/panama/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/panama/west-bank-and-gaza/">Panama vs Palestine, State of: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.