Panama vs Palestine, State of: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Panama
- Palestine, State of
How they compare
Palestine, State of currently reports 108 days against 105 days in Panama, a difference of 3 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Panama ahead.
Panama ranks 132nd and Palestine, State of ranks 129th of 187 countries.
Across the 2 decades both report, Panama averaged higher in 1 and Palestine, State of in 1.
Head to head by decade
| Decade | Panama | Palestine, State of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 141.2 days | 109 days | 32.2 days | Panama |
| 2010s | 107.8 days | 108.5 days | 0.7 days | Palestine, State of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Panama or Palestine, State of?
- Palestine, State of, at 108 days against 105 days in Panama as of 2019.
- What is the difference in dealing with construction permits: time between Panama and Palestine, State of?
- 3 days, with Palestine, State of ahead.
- How many years of comparable data are there for Panama and Palestine, State of?
- 15 years are reported by both, from 2005 to 2019.
- How do Panama and Palestine, State of rank globally for dealing with construction permits: time?
- Panama ranks 132nd and Palestine, State of ranks 129th of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.