Dealing with construction permits: Time in Panama

Panama: Dealing with construction permits: Time was 105 days in 2019. ▼ Falling

Latest (2019)
105 days
Change on year
unchanged
World rank
130th
of 185 countries
All-time high
147 days
in 2005
All-time low
105 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Panama, 2005–2019

0501001502005201220192005: 147 days2006: 147 days2007: 147 days2008: 147 days2009: 118 days2010: 118 days2011: 118 days2012: 107 days2013: 105 days2014: 105 days2015: 105 days2016: 105 days2017: 105 days2018: 105 days2019: 105 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Panama stood at 105 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 11.0% over ten years.

Over the whole period, dealing with construction permits: time in Panama peaked at 147 days in 2005 and was at its lowest, 105 days, in 2013.

Panama ranks 130th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 141.2 days 118 days 147 days 5
2010s 107.8 days 105 days 118 days 10

Countries ranked near Panama

  1. 127 West Bank and Gaza 108 days compare
  2. 128 Comoros 107 days compare
  3. 129 India 106.22 days compare
  4. 130 St. Kitts and Nevis 105 days compare
  5. 132 Nigeria 104.79 days compare
  6. 133 Mauritania 104 days compare

See the full ranking of 187 places →

More private sector data for Panama

All data for Panama →

Frequently asked questions

What is dealing with construction permits: time in Panama?
Dealing with construction permits: time in Panama was 105 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Panama?
The highest recorded value was 147 days in 2005.
What is the lowest dealing with construction permits: time recorded in Panama?
The lowest recorded value was 105 days in 2013.
How does Panama rank for dealing with construction permits: time?
Panama ranks 130th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Panama?
Over the last ten years it is down 11.0%. The long-run trend across the full record is falling.
Where does this Panama data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.