Paraguay vs Philippines: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Paraguay
- Philippines
How they compare
Paraguay currently reports 121 days against 120 days in Philippines, a difference of 1 days.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Paraguay ahead.
Paraguay ranks 111th and Philippines ranks 114th of 185 countries.
Paraguay has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Paraguay | Philippines | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 275 days | 128.8 days | 146.2 days | Paraguay |
| 2010s | 125.2 days | 123.8 days | 1.4 days | Paraguay |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Paraguay or Philippines?
- Paraguay, at 121 days against 120 days in Philippines as of 2019.
- What is the difference in dealing with construction permits: time between Paraguay and Philippines?
- 1 days, with Paraguay ahead.
- How many years of comparable data are there for Paraguay and Philippines?
- 15 years are reported by both, from 2005 to 2019.
- How do Paraguay and Philippines rank globally for dealing with construction permits: time?
- Paraguay ranks 111th and Philippines ranks 114th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.