Paraguay vs Vanuatu: Dealing with construction permits: Time

Paraguay
121 days
in 2019
Vanuatu
123 days
in 2019
Paraguay rank
111th
Vanuatu rank
109th

Dealing with construction permits: Time over time

  • Paraguay
  • Vanuatu
50100150200250300200520122019

How they compare

Vanuatu currently reports 123 days against 121 days in Paraguay, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Paraguay ahead.

Paraguay ranks 111th and Vanuatu ranks 109th of 185 countries.

Paraguay has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Paraguay Vanuatu Difference Ahead
2000s 275 days 59 days 216 days Paraguay
2010s 125.2 days 114.5 days 10.7 days Paraguay

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Paraguay or Vanuatu?
Vanuatu, at 123 days against 121 days in Paraguay as of 2019.
What is the difference in dealing with construction permits: time between Paraguay and Vanuatu?
2 days, with Vanuatu ahead.
How many years of comparable data are there for Paraguay and Vanuatu?
15 years are reported by both, from 2005 to 2019.
How do Paraguay and Vanuatu rank globally for dealing with construction permits: time?
Paraguay ranks 111th and Vanuatu ranks 109th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.