Dealing with construction permits: Time (days) (Time days) in Vanuatu

Vanuatu: Dealing with construction permits: Time was 123 days in 2019. ▲ Rising

Latest (2019)
123 days
Change on year
unchanged
World rank
112th
of 188 countries
All-time high
123 days
in 2014
All-time low
59 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Vanuatu, 2005–2019

02550751001252005201220192005: 59 days2006: 59 days2007: 59 days2008: 59 days2009: 59 days2010: 59 days2011: 106 days2012: 121 days2013: 121 days2014: 123 days2015: 123 days2016: 123 days2017: 123 days2018: 123 days2019: 123 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Vanuatu stood at 123 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 108.5% over ten years.

Over the whole period, dealing with construction permits: time in Vanuatu peaked at 123 days in 2014 and was at its lowest, 59 days, in 2005.

Vanuatu ranks 112th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Vanuatu, year by year

Annual values for Dealing with construction permits: Time (days) in Vanuatu, 2005 to 2019.
Year days Change
2005 59 days —
2006 59 days +0.0%
2007 59 days +0.0%
2008 59 days +0.0%
2009 59 days +0.0%
2010 59 days +0.0%
2011 106 days +79.7%
2012 121 days +14.2%
2013 121 days +0.0%
2014 123 days +1.7%
2015 123 days +0.0%
2016 123 days +0.0%
2017 123 days +0.0%
2018 123 days +0.0%
2019 123 days +0.0%

Vanuatu compared with similar countries

  • Vanuatu's 123 days is below the median for lower middle income countries, which is 159 days, 77% of the median. (47 countries reporting)
  • Vanuatu's 123 days is above the median for East Asia & Pacific, which is 103.67 days, 1.2× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 59 days 59 days 59 days 5
2010s 114.5 days 59 days 123 days 10

Countries ranked near Vanuatu

  1. 109 Oman 125 days compare
  2. 110 Pakistan 124.9 days compare
  3. 111 Mali 124 days compare
  4. 113 Democratic Republic of Congo 122 days compare
  5. 114 Burkina Faso 121 days compare
  6. 114 Paraguay 121 days compare

See the full ranking of 188 places →

More private sector data for Vanuatu

All data for Vanuatu →

Frequently asked questions

What is dealing with construction permits: time in Vanuatu?
Dealing with construction permits: time in Vanuatu was 123 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Vanuatu?
The highest recorded value was 123 days in 2014.
What is the lowest dealing with construction permits: time recorded in Vanuatu?
The lowest recorded value was 59 days in 2005.
How does Vanuatu rank for dealing with construction permits: time?
Vanuatu ranks 112th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Vanuatu?
Over the last ten years it is up 108.5%. The long-run trend across the full record is rising.
Where does this Vanuatu data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Vanuatu. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/vanuatu/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/vanuatu/">Dealing with construction permits: Time in Vanuatu</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.