Philippines vs Sweden: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Philippines
- Sweden
How they compare
Philippines currently reports 120 days against 117 days in Sweden, a difference of 3 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Sweden ahead.
Philippines ranks 114th and Sweden ranks 117th of 185 countries.
Across the 2 decades both report, Philippines averaged higher in 1 and Sweden in 1.
Head to head by decade
| Decade | Philippines | Sweden | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 128.8 days | 147 days | 18.2 days | Sweden |
| 2010s | 123.8 days | 123 days | 0.8 days | Philippines |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Philippines or Sweden?
- Philippines, at 120 days against 117 days in Sweden as of 2019.
- What is the difference in dealing with construction permits: time between Philippines and Sweden?
- 3 days, with Philippines ahead.
- How many years of comparable data are there for Philippines and Sweden?
- 15 years are reported by both, from 2005 to 2019.
- How do Philippines and Sweden rank globally for dealing with construction permits: time?
- Philippines ranks 114th and Sweden ranks 117th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.