Puerto Rico vs Vietnam: Dealing with construction permits: Time

Puerto Rico
165 days
in 2019
Vietnam
166 days
in 2019
Puerto Rico rank
65th
Vietnam rank
64th

Dealing with construction permits: Time over time

  • Puerto Rico
  • Vietnam
050100150200200520122019

How they compare

Vietnam currently reports 166 days against 165 days in Puerto Rico, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Puerto Rico ahead.

Puerto Rico ranks 65th and Vietnam ranks 64th of 187 countries.

Puerto Rico has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Puerto Rico Vietnam Difference Ahead
2000s 175 days 166 days 9 days Puerto Rico
2010s 173.8 days 166 days 7.8 days Puerto Rico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Puerto Rico or Vietnam?
Vietnam, at 166 days against 165 days in Puerto Rico as of 2019.
What is the difference in dealing with construction permits: time between Puerto Rico and Vietnam?
1 days, with Vietnam ahead.
How many years of comparable data are there for Puerto Rico and Vietnam?
15 years are reported by both, from 2005 to 2019.
How do Puerto Rico and Vietnam rank globally for dealing with construction permits: time?
Puerto Rico ranks 65th and Vietnam ranks 64th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Puerto Rico vs Vietnam: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/puerto-rico-us/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/puerto-rico-us/viet-nam/">Puerto Rico vs Vietnam: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.