Dealing with construction permits: Time in Vietnam
Vietnam: Dealing with construction permits: Time was 166 days in 2019. ▬ Flat
Dealing with construction permits: Time in Vietnam, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Vietnam is 166 days, measured in 2019. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Vietnam peaked at 166 days in 2005 and was at its lowest, 166 days, in 2005.
That places Vietnam 63rd out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 166 days | 166 days | 166 days | 5 |
| 2010s | 166 days | 166 days | 166 days | 10 |
Countries ranked near Vietnam
More private sector data for Vietnam
- Merchandise trade 180.0% (2025)
- Food imports 8.8% (2023)
- Manufactures imports 74.7% (2023)
- Merchandise imports 453.78 billion current US$ (2025)
- Food exports 9.4% (2023)
- Manufactures exports 85.0% (2023)
- Merchandise exports 472.93 billion current US$ (2025)
- Commercial service exports 25.02 billion current US$ (2024)
- Commercial service imports 35.60 billion current US$ (2024)
- Merchandise imports from economies in the Arab World 2.6% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Vietnam?
- Dealing with construction permits: time in Vietnam was 166 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Vietnam?
- The highest recorded value was 166 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Vietnam?
- The lowest recorded value was 166 days in 2005.
- How does Vietnam rank for dealing with construction permits: time?
- Vietnam ranks 63rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Vietnam?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Vietnam data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.