Russia vs Vietnam: Dealing with construction permits: Time (days) (Time days)

Russia
164.5 days
in 2019
Vietnam
166 days
in 2019
Russia rank
67th
Vietnam rank
65th

Dealing with construction permits: Time (days) (Time days) over time

  • Russia
  • Vietnam
200400600200520122019

How they compare

Vietnam currently reports 166 days against 164.5 days in Russia, a difference of 1.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Russia ahead.

Russia ranks 67th and Vietnam ranks 65th of 188 countries.

Russia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Russia Vietnam Difference Ahead
2000s 666.8 days 166 days 500.8 days Russia
2010s 267.81 days 166 days 101.81 days Russia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Russia or Vietnam?
Vietnam, at 166 days against 164.5 days in Russia as of 2019.
What is the difference in dealing with construction permits: time between Russia and Vietnam?
1.5 days, with Vietnam ahead.
How many years of comparable data are there for Russia and Vietnam?
15 years are reported by both, from 2005 to 2019.
How do Russia and Vietnam rank globally for dealing with construction permits: time?
Russia ranks 67th and Vietnam ranks 65th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Russia vs Vietnam: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/russian-federation/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/russian-federation/viet-nam/">Russia vs Vietnam: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.