Rwanda vs Solomon Islands: Dealing with construction permits: Time

Rwanda
97 days
in 2019
Solomon Islands
99 days
in 2019
Rwanda rank
146th
Solomon Islands rank
143rd

Dealing with construction permits: Time over time

  • Rwanda
  • Solomon Islands
100150200250300200520122019

How they compare

Solomon Islands currently reports 99 days against 97 days in Rwanda, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Rwanda ahead.

Rwanda ranks 146th and Solomon Islands ranks 143rd of 185 countries.

Rwanda has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Rwanda Solomon Islands Difference Ahead
2000s 227.2 days 99 days 128.2 days Rwanda
2010s 125.6 days 99 days 26.6 days Rwanda

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Rwanda or Solomon Islands?
Solomon Islands, at 99 days against 97 days in Rwanda as of 2019.
What is the difference in dealing with construction permits: time between Rwanda and Solomon Islands?
2 days, with Solomon Islands ahead.
How many years of comparable data are there for Rwanda and Solomon Islands?
15 years are reported by both, from 2005 to 2019.
How do Rwanda and Solomon Islands rank globally for dealing with construction permits: time?
Rwanda ranks 146th and Solomon Islands ranks 143rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.