Saint Kitts and Nevis vs Palestine: Dealing with construction permits: Time

Saint Kitts and Nevis
105 days
in 2019
Palestine
108 days
in 2019
Saint Kitts and Nevis rank
133rd
Palestine rank
130th

Dealing with construction permits: Time over time

  • Saint Kitts and Nevis
  • Palestine
0255075100200520122019

How they compare

Palestine currently reports 108 days against 105 days in Saint Kitts and Nevis, a difference of 3 days.

Across all 15 years both countries report, Palestine has been ahead every year.

Saint Kitts and Nevis ranks 133rd and Palestine ranks 130th of 188 countries.

Palestine has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Saint Kitts and Nevis Palestine Difference Ahead
2000s 105 days 109 days 4 days Palestine
2010s 105 days 108.5 days 3.5 days Palestine

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Saint Kitts and Nevis or Palestine?
Palestine, at 108 days against 105 days in Saint Kitts and Nevis as of 2019.
What is the difference in dealing with construction permits: time between Saint Kitts and Nevis and Palestine?
3 days, with Palestine ahead.
How many years of comparable data are there for Saint Kitts and Nevis and Palestine?
15 years are reported by both, from 2005 to 2019.
How do Saint Kitts and Nevis and Palestine rank globally for dealing with construction permits: time?
Saint Kitts and Nevis ranks 133rd and Palestine ranks 130th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Saint Kitts and Nevis vs Palestine: Dealing with construction permits: Time. Statizoid. Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/st-kitts-and-nevis/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/st-kitts-and-nevis/west-bank-and-gaza/">Saint Kitts and Nevis vs Palestine: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.