Saint Kitts and Nevis vs Palestine: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Saint Kitts and Nevis
- Palestine
How they compare
Palestine currently reports 108 days against 105 days in Saint Kitts and Nevis, a difference of 3 days.
Across all 15 years both countries report, Palestine has been ahead every year.
Saint Kitts and Nevis ranks 133rd and Palestine ranks 130th of 188 countries.
Palestine has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Saint Kitts and Nevis | Palestine | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 105 days | 109 days | 4 days | Palestine |
| 2010s | 105 days | 108.5 days | 3.5 days | Palestine |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Saint Kitts and Nevis or Palestine?
- Palestine, at 108 days against 105 days in Saint Kitts and Nevis as of 2019.
- What is the difference in dealing with construction permits: time between Saint Kitts and Nevis and Palestine?
- 3 days, with Palestine ahead.
- How many years of comparable data are there for Saint Kitts and Nevis and Palestine?
- 15 years are reported by both, from 2005 to 2019.
- How do Saint Kitts and Nevis and Palestine rank globally for dealing with construction permits: time?
- Saint Kitts and Nevis ranks 133rd and Palestine ranks 130th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.