Dealing with construction permits: Time (days) (Time days) in Saint Kitts and Nevis
Saint Kitts and Nevis: Dealing with construction permits: Time was 105 days in 2019. ▬ Flat
Dealing with construction permits: Time in Saint Kitts and Nevis, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Saint Kitts and Nevis is 105 days, measured in 2019. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Saint Kitts and Nevis peaked at 105 days in 2005 and was at its lowest, 105 days, in 2005.
That places Saint Kitts and Nevis 133rd out of 188 countries with data for 2019, putting it in the middle of the range.
Dealing with construction permits: Time in Saint Kitts and Nevis, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 105 days | — |
| 2006 | 105 days | +0.0% |
| 2007 | 105 days | +0.0% |
| 2008 | 105 days | +0.0% |
| 2009 | 105 days | +0.0% |
| 2010 | 105 days | +0.0% |
| 2011 | 105 days | +0.0% |
| 2012 | 105 days | +0.0% |
| 2013 | 105 days | +0.0% |
| 2014 | 105 days | +0.0% |
| 2015 | 105 days | +0.0% |
| 2016 | 105 days | +0.0% |
| 2017 | 105 days | +0.0% |
| 2018 | 105 days | +0.0% |
| 2019 | 105 days | +0.0% |
Saint Kitts and Nevis compared with similar countries
- Saint Kitts and Nevis's 105 days is below the median for high income countries, which is 144.75 days, 73% of the median. (62 countries reporting)
- Saint Kitts and Nevis's 105 days is below the median for Latin America & Caribbean, which is 165 days, 64% of the median. (33 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 105 days | 105 days | 105 days | 5 |
| 2010s | 105 days | 105 days | 105 days | 10 |
Countries ranked near Saint Kitts and Nevis
More private sector data for Saint Kitts and Nevis
- Merchandise trade 37.5% (2025)
- Food imports 25.4% (2017)
- Manufactures imports 71.1% (2017)
- Merchandise imports 410.00 million current US$ (2025)
- Food exports 13.5% (2017)
- Manufactures exports 86.4% (2017)
- Merchandise exports 34.00 million current US$ (2025)
- Merchandise exports (current US$), per capita 724.61 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.0287 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 9.68 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: time in Saint Kitts and Nevis?
- Dealing with construction permits: time in Saint Kitts and Nevis was 105 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Saint Kitts and Nevis?
- The highest recorded value was 105 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Saint Kitts and Nevis?
- The lowest recorded value was 105 days in 2005.
- How does Saint Kitts and Nevis rank for dealing with construction permits: time?
- Saint Kitts and Nevis ranks 133rd out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Saint Kitts and Nevis?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Saint Kitts and Nevis data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.