Dealing with construction permits: Time in St. Kitts and Nevis
St. Kitts and Nevis: Dealing with construction permits: Time was 105 days in 2019. ▬ Flat
Dealing with construction permits: Time in St. Kitts and Nevis, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in St. Kitts and Nevis is 105 days, measured in 2019. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in St. Kitts and Nevis peaked at 105 days in 2005 and was at its lowest, 105 days, in 2005.
That places St. Kitts and Nevis 130th out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 105 days | 105 days | 105 days | 5 |
| 2010s | 105 days | 105 days | 105 days | 10 |
Countries ranked near St. Kitts and Nevis
More private sector data for St. Kitts and Nevis
- Merchandise trade 37.5% (2025)
- Food imports 25.4% (2017)
- Manufactures imports 71.1% (2017)
- Merchandise imports 410.00 million current US$ (2025)
- Food exports 13.5% (2017)
- Manufactures exports 86.4% (2017)
- Merchandise exports 34.00 million current US$ (2025)
- Commercial service exports 493.43 million current US$ (2025)
- Transport services 26.3% (2025)
- Computer, communications and other services 37.2% (2025)
Frequently asked questions
- What is dealing with construction permits: time in St. Kitts and Nevis?
- Dealing with construction permits: time in St. Kitts and Nevis was 105 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in St. Kitts and Nevis?
- The highest recorded value was 105 days in 2005.
- What is the lowest dealing with construction permits: time recorded in St. Kitts and Nevis?
- The lowest recorded value was 105 days in 2005.
- How does St. Kitts and Nevis rank for dealing with construction permits: time?
- St. Kitts and Nevis ranks 130th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in St. Kitts and Nevis?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this St. Kitts and Nevis data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.