Togo vs Vietnam: Dealing with construction permits: Time (days) (Time days)

Togo
168.5 days
in 2019
Vietnam
166 days
in 2019
Togo rank
62nd
Vietnam rank
65th

Dealing with construction permits: Time (days) (Time days) over time

  • Togo
  • Vietnam
0100200300200520122019

How they compare

Togo currently reports 168.5 days against 166 days in Vietnam, a difference of 2.5 days.

Across all 15 years both countries report, Togo has been ahead every year.

Togo ranks 62nd and Vietnam ranks 65th of 188 countries.

Togo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Togo Vietnam Difference Ahead
2000s 306 days 166 days 140 days Togo
2010s 210.35 days 166 days 44.35 days Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Togo or Vietnam?
Togo, at 168.5 days against 166 days in Vietnam as of 2019.
What is the difference in dealing with construction permits: time between Togo and Vietnam?
2.5 days, with Togo ahead.
How many years of comparable data are there for Togo and Vietnam?
15 years are reported by both, from 2005 to 2019.
How do Togo and Vietnam rank globally for dealing with construction permits: time?
Togo ranks 62nd and Vietnam ranks 65th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Togo vs Vietnam: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/togo/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/togo/viet-nam/">Togo vs Vietnam: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.