Sub-Saharan Africa (excluding high income) vs Tanzania: Dealing with construction, procedures

Sub-Saharan Africa (excluding high income)
14.7 number
in 2012
Tanzania
19 number
in 2012
Sub-Saharan Africa (excluding high income) rank
6th
Tanzania rank
7th

Dealing with construction, procedures over time

  • Sub-Saharan Africa (excluding high income)
  • Tanzania
05101520200520082012

How they compare

Tanzania currently reports 19 number against 14.7 number in Sub-Saharan Africa (excluding high income), a difference of 4.3 number.

That makes Tanzania's figure about 1.3 times Sub-Saharan Africa (excluding high income)'s.

Across all 8 years both countries report, Tanzania has been ahead every year.

Sub-Saharan Africa (excluding high income) ranks 6th and Tanzania ranks 7th of 6 groups.

Tanzania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sub-Saharan Africa (excluding high income) Tanzania Difference Ahead
2000s 15.48 number 18.2 number 2.72 number Tanzania
2010s 14.76 number 19 number 4.24 number Tanzania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction, procedures, Sub-Saharan Africa (excluding high income) or Tanzania?
Tanzania, at 19 number against 14.7 number in Sub-Saharan Africa (excluding high income) as of 2012.
What is the difference in dealing with construction, procedures between Sub-Saharan Africa (excluding high income) and Tanzania?
4.3 number, with Tanzania ahead.
How many years of comparable data are there for Sub-Saharan Africa (excluding high income) and Tanzania?
8 years are reported by both, from 2005 to 2012.
How do Sub-Saharan Africa (excluding high income) and Tanzania rank globally for dealing with construction, procedures?
Sub-Saharan Africa (excluding high income) ranks 6th and Tanzania ranks 7th of 6 groups.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction, procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sub-Saharan Africa (excluding high income) vs Tanzania: Dealing with construction, procedures. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-procedures-number/sub-saharan-africa-excluding-high-income/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-procedures-number/sub-saharan-africa-excluding-high-income/tanzania/">Sub-Saharan Africa (excluding high income) vs Tanzania: Dealing with construction, procedures</a> — Statizoid

About this data

Indicator
Dealing with construction, procedures (number)
Unit
number
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility com­panies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.