Libya vs Suriname: Getting electricity (DB16-20 methodology) - Score

Libya
59.02
in 2019
Suriname
57.74
in 2019
Libya rank
143rd
Suriname rank
146th

Getting electricity (DB16-20 methodology) - Score over time

  • Libya
  • Suriname
0204060201420162019

How they compare

Libya currently reports 59.02 against 57.74 in Suriname, a difference of 1.28.

The two have swapped places 2 times across 6 shared years of data; in 2014 it was Libya ahead.

Libya ranks 143rd and Suriname ranks 146th of 191 countries.

Libya has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity (db16-20 methodology) - score, Libya or Suriname?
Libya, at 59.02 against 57.74 in Suriname as of 2019.
What is the difference in getting electricity (db16-20 methodology) - score between Libya and Suriname?
1.28, with Libya ahead.
How many years of comparable data are there for Libya and Suriname?
6 years are reported by both, from 2014 to 2019.
How do Libya and Suriname rank globally for getting electricity (db16-20 methodology) - score?
Libya ranks 143rd and Suriname ranks 146th of 191 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Libya vs Suriname: Getting electricity (DB16-20 methodology) - Score. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-db16-20-methodology-score/libya/suriname/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-db16-20-methodology-score/libya/suriname/">Libya vs Suriname: Getting electricity (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Getting electricity (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.