Getting electricity (DB16-20 methodology) - Score in Suriname

Suriname: Getting electricity (DB16-20 methodology) - Score was 57.74 in 2019. ▬ Flat

Latest (2019)
57.74
Change on year
down 0.8%
World rank
143rd
of 188 countries
All-time high
59.07
in 2015
All-time low
57.74
in 2019
Years of data
6
2014–2019

Getting electricity (DB16-20 methodology) - Score in Suriname, 2014–2019

02040602014201620192014: 592015: 59.12016: 592017: 58.62018: 58.22019: 57.7

Source: World Bank.

Analysis

Suriname recorded 57.74 for getting electricity (db16-20 methodology) - score in 2019. That is the lowest value across all 6 years on record.

The figure is down 0.8% on the previous year and down 2.1% over ten years.

Suriname ranks 143rd of 188 countries on this measure, in the bottom quarter.

Countries ranked near Suriname

  1. 140 Libya 59.02 compare
  2. 141 Kyrgyzstan 58.61 compare
  3. 142 Laos 58.03 compare
  4. 144 Cambodia 57.46 compare
  5. 145 Haiti 57.17 compare
  6. 146 Myanmar 56.68 compare

See the full ranking of 190 places →

More private sector data for Suriname

All data for Suriname →

Frequently asked questions

What is getting electricity (db16-20 methodology) - score in Suriname?
Getting electricity (db16-20 methodology) - score in Suriname was 57.74 in 2019, according to the World Bank.
What is the highest getting electricity (db16-20 methodology) - score recorded in Suriname?
The highest recorded value was 59.07 in 2015.
What is the lowest getting electricity (db16-20 methodology) - score recorded in Suriname?
The lowest recorded value was 57.74 in 2019.
How does Suriname rank for getting electricity (db16-20 methodology) - score?
Suriname ranks 143rd out of 188 countries with data for 2019.
Is getting electricity (db16-20 methodology) - score rising or falling in Suriname?
Over the last ten years it is down 2.1%. The long-run trend across the full record is flat.
Where does this Suriname data come from?
The figures come from the World Bank, published as part of Getting electricity (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.