Belize vs Dominica: Getting electricity: Minimum outage time (in minutes)

Belize
5 DB16-20 methodology
in 2019
Dominica
5 DB16-20 methodology
in 2019
Belize rank
5th
Dominica rank
5th

Getting electricity: Minimum outage time (in minutes) over time

  • Belize
  • Dominica
012345201420162019

How they compare

Belize currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Dominica, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Dominica has been ahead every year.

Belize ranks 5th and Dominica ranks 5th of 136 countries.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Belize or Dominica?
Belize, at 5 DB16-20 methodology against 5 DB16-20 methodology in Dominica as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Belize and Dominica?
0 DB16-20 methodology, with Belize ahead.
How many years of comparable data are there for Belize and Dominica?
6 years are reported by both, from 2014 to 2019.
How do Belize and Dominica rank globally for getting electricity: minimum outage time (in minutes)?
Belize ranks 5th and Dominica ranks 5th of 136 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belize vs Dominica: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/belize/dominica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/belize/dominica/">Belize vs Dominica: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
136 places, 816 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.