South Korea vs Namibia: Getting electricity: Minimum outage time (in minutes)
South Korea
5 DB16-20 methodology
in 2019
Namibia
5 DB16-20 methodology
in 2019
South Korea rank
5th
Namibia rank
5th
Getting electricity: Minimum outage time (in minutes) over time
- South Korea
- Namibia
How they compare
South Korea currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Namibia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Namibia has been ahead every year.
South Korea ranks 5th and Namibia ranks 5th of 135 countries.
Frequently asked questions
- Which has higher getting electricity: minimum outage time (in minutes), South Korea or Namibia?
- South Korea, at 5 DB16-20 methodology against 5 DB16-20 methodology in Namibia as of 2019.
- What is the difference in getting electricity: minimum outage time (in minutes) between South Korea and Namibia?
- 0 DB16-20 methodology, with South Korea ahead.
- How many years of comparable data are there for South Korea and Namibia?
- 6 years are reported by both, from 2014 to 2019.
- How do South Korea and Namibia rank globally for getting electricity: minimum outage time (in minutes)?
- South Korea ranks 5th and Namibia ranks 5th of 135 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.