Namibia vs Nigeria: Getting electricity: Minimum outage time (in minutes)
Namibia
5 DB16-20 methodology
in 2019
Nigeria
5 DB16-20 methodology
in 2019
Namibia rank
5th
Nigeria rank
5th
Getting electricity: Minimum outage time (in minutes) over time
- Namibia
- Nigeria
How they compare
Namibia currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Nigeria, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Nigeria has been ahead every year.
Namibia ranks 5th and Nigeria ranks 5th of 135 countries.
Frequently asked questions
- Which has higher getting electricity: minimum outage time (in minutes), Namibia or Nigeria?
- Namibia, at 5 DB16-20 methodology against 5 DB16-20 methodology in Nigeria as of 2019.
- What is the difference in getting electricity: minimum outage time (in minutes) between Namibia and Nigeria?
- 0 DB16-20 methodology, with Namibia ahead.
- How many years of comparable data are there for Namibia and Nigeria?
- 6 years are reported by both, from 2014 to 2019.
- How do Namibia and Nigeria rank globally for getting electricity: minimum outage time (in minutes)?
- Namibia ranks 5th and Nigeria ranks 5th of 135 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.