North Macedonia vs Tanzania: Getting electricity: Minimum outage time (in minutes)
North Macedonia
3 DB16-20 methodology
in 2019
Tanzania
4 DB16-20 methodology
in 2019
North Macedonia rank
48th
Tanzania rank
47th
Getting electricity: Minimum outage time (in minutes) over time
- North Macedonia
- Tanzania
How they compare
Tanzania currently reports 4 DB16-20 methodology against 3 DB16-20 methodology in North Macedonia, a difference of 1 DB16-20 methodology.
That makes Tanzania's figure about 1.3 times North Macedonia's.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was North Macedonia ahead.
North Macedonia ranks 48th and Tanzania ranks 47th of 137 countries.
Frequently asked questions
- Which has higher getting electricity: minimum outage time (in minutes), North Macedonia or Tanzania?
- Tanzania, at 4 DB16-20 methodology against 3 DB16-20 methodology in North Macedonia as of 2019.
- What is the difference in getting electricity: minimum outage time (in minutes) between North Macedonia and Tanzania?
- 1 DB16-20 methodology, with Tanzania ahead.
- How many years of comparable data are there for North Macedonia and Tanzania?
- 6 years are reported by both, from 2014 to 2019.
- How do North Macedonia and Tanzania rank globally for getting electricity: minimum outage time (in minutes)?
- North Macedonia ranks 48th and Tanzania ranks 47th of 137 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.