Palau vs Suriname: Getting electricity: Minimum outage time (in minutes)

Palau
30 DB16-20 methodology
in 2019
Suriname
30 DB16-20 methodology
in 2019
Palau rank
1st
Suriname rank
1st

Getting electricity: Minimum outage time (in minutes) over time

  • Palau
  • Suriname
0102030201420162019

How they compare

Palau currently reports 30 DB16-20 methodology against 30 DB16-20 methodology in Suriname, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Suriname has been ahead every year.

Palau ranks 1st and Suriname ranks 1st of 137 countries.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Palau or Suriname?
Palau, at 30 DB16-20 methodology against 30 DB16-20 methodology in Suriname as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Palau and Suriname?
0 DB16-20 methodology, with Palau ahead.
How many years of comparable data are there for Palau and Suriname?
6 years are reported by both, from 2014 to 2019.
How do Palau and Suriname rank globally for getting electricity: minimum outage time (in minutes)?
Palau ranks 1st and Suriname ranks 1st of 137 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Palau vs Suriname: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/palau/suriname/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/palau/suriname/">Palau vs Suriname: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
137 places, 822 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.