Solomon Islands vs Sri Lanka: Getting electricity: Minimum outage time (in minutes)

Solomon Islands
2 DB16-20 methodology
in 2019
Sri Lanka
2 DB16-20 methodology
in 2019
Solomon Islands rank
99th
Sri Lanka rank
99th

Getting electricity: Minimum outage time (in minutes) over time

  • Solomon Islands
  • Sri Lanka
012345201420162019

How they compare

Solomon Islands currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Sri Lanka, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Sri Lanka has been ahead every year.

Solomon Islands ranks 99th and Sri Lanka ranks 99th of 137 countries.

Sri Lanka has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Solomon Islands or Sri Lanka?
Solomon Islands, at 2 DB16-20 methodology against 2 DB16-20 methodology in Sri Lanka as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Solomon Islands and Sri Lanka?
0 DB16-20 methodology, with Solomon Islands ahead.
How many years of comparable data are there for Solomon Islands and Sri Lanka?
6 years are reported by both, from 2014 to 2019.
How do Solomon Islands and Sri Lanka rank globally for getting electricity: minimum outage time (in minutes)?
Solomon Islands ranks 99th and Sri Lanka ranks 99th of 137 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Solomon Islands vs Sri Lanka: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 28 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/solomon-islands/sri-lanka/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/solomon-islands/sri-lanka/">Solomon Islands vs Sri Lanka: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
137 places, 822 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.