Sweden vs United States: Getting electricity: Minimum outage time (in minutes)
Getting electricity: Minimum outage time (in minutes) over time
- Sweden
- United States
How they compare
United States currently reports 4.2 DB16-20 methodology against 3 DB16-20 methodology in Sweden, a difference of 1.2 DB16-20 methodology.
That makes United States's figure about 1.4 times Sweden's.
Across all 6 years both countries report, United States has been ahead every year.
Sweden ranks 48th and United States ranks 46th of 137 countries.
United States has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher getting electricity: minimum outage time (in minutes), Sweden or United States?
- United States, at 4.2 DB16-20 methodology against 3 DB16-20 methodology in Sweden as of 2019.
- What is the difference in getting electricity: minimum outage time (in minutes) between Sweden and United States?
- 1.2 DB16-20 methodology, with United States ahead.
- How many years of comparable data are there for Sweden and United States?
- 6 years are reported by both, from 2014 to 2019.
- How do Sweden and United States rank globally for getting electricity: minimum outage time (in minutes)?
- Sweden ranks 48th and United States ranks 46th of 137 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.