Uganda vs Zambia: Getting electricity: Minimum outage time (in minutes)
Uganda
5 DB16-20 methodology
in 2019
Zambia
5 DB16-20 methodology
in 2019
Uganda rank
5th
Zambia rank
5th
Getting electricity: Minimum outage time (in minutes) over time
- Uganda
- Zambia
How they compare
Uganda currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Zambia, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Uganda ahead.
Uganda ranks 5th and Zambia ranks 5th of 136 countries.
Uganda has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher getting electricity: minimum outage time (in minutes), Uganda or Zambia?
- Uganda, at 5 DB16-20 methodology against 5 DB16-20 methodology in Zambia as of 2019.
- What is the difference in getting electricity: minimum outage time (in minutes) between Uganda and Zambia?
- 0 DB16-20 methodology, with Uganda ahead.
- How many years of comparable data are there for Uganda and Zambia?
- 6 years are reported by both, from 2014 to 2019.
- How do Uganda and Zambia rank globally for getting electricity: minimum outage time (in minutes)?
- Uganda ranks 5th and Zambia ranks 5th of 136 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.