Czechia vs Micronesia (country): Getting electricity: Procedures (number)

Czechia
3 number
in 2019
Micronesia (country)
3 number
in 2019
Czechia rank
162nd
Micronesia (country) rank
162nd

Getting electricity: Procedures (number) over time

  • Czechia
  • Micronesia (country)
01234200920142019

How they compare

Czechia currently reports 3 number against 3 number in Micronesia (country), a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Czechia ahead.

Czechia ranks 162nd and Micronesia (country) ranks 162nd of 189 countries.

Czechia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Czechia Micronesia (country) Difference Ahead
2000s 4 number 3 number 1 number Czechia
2010s 3.3 number 3 number 0.3 number Czechia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Czechia or Micronesia (country)?
Czechia, at 3 number against 3 number in Micronesia (country) as of 2019.
What is the difference in getting electricity: procedures between Czechia and Micronesia (country)?
0 number, with Czechia ahead.
How many years of comparable data are there for Czechia and Micronesia (country)?
11 years are reported by both, from 2009 to 2019.
How do Czechia and Micronesia (country) rank globally for getting electricity: procedures?
Czechia ranks 162nd and Micronesia (country) ranks 162nd of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Czechia vs Micronesia (country): Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/czechia/micronesia-fed-sts/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/czechia/micronesia-fed-sts/">Czechia vs Micronesia (country): Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.