Getting electricity: Procedures in Micronesia, Fed. Sts.
Micronesia, Fed. Sts.: Getting electricity: Procedures was 3 number in 2019. ▬ Flat
Getting electricity: Procedures in Micronesia, Fed. Sts., 2009–2019
Source: World Bank. Measured in number.
Analysis
In 2019, getting electricity: procedures in Micronesia, Fed. Sts. stood at 3 number. That is the highest value across all 11 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, getting electricity: procedures in Micronesia, Fed. Sts. peaked at 3 number in 2009 and was at its lowest, 3 number, in 2009.
That places Micronesia, Fed. Sts. 159th out of 186 countries with data for 2019, putting it in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 3 number | 3 number | 3 number | 1 |
| 2010s | 3 number | 3 number | 3 number | 10 |
Countries ranked near Micronesia, Fed. Sts.
- 158 India 3.47 number compare
- 159 Belarus 3 number compare
- 159 Comoros 3 number compare
- 159 Czechia 3 number compare
- 159 Georgia 3 number compare
- 159 Germany 3 number compare
- 159 Hong Kong 3 number compare
- 159 Kenya 3 number compare
- 159 Korea, Rep. 3 number compare
- 159 Lithuania 3 number compare
- 159 Malaysia 3 number compare
- 159 Mauritius 3 number compare
- 159 North Macedonia 3 number compare
- 159 San Marino 3 number compare
- 159 St. Vincent and the Grenadines 3 number compare
- 159 Sweden 3 number compare
- 159 Switzerland 3 number compare
- 159 Taiwan 3 number compare
- 159 Timor-Leste 3 number compare
- 159 Togo 3 number compare
- 159 United Kingdom 3 number compare
More private sector data for Micronesia, Fed. Sts.
- Merchandise trade 83.5% (2025)
- Food imports 27.8% (2013)
- Manufactures imports 36.1% (2013)
- Merchandise imports 310.00 million current US$ (2025)
- Food exports 99.2% (2013)
- Manufactures exports 0.5% (2013)
- Merchandise exports 109.00 million current US$ (2025)
- Commercial service exports 33.42 million current US$ (2014)
- Transport services 56.9% (2014)
- Computer, communications and other services 24.2% (2014)
Frequently asked questions
- What is getting electricity: procedures in Micronesia, Fed. Sts.?
- Getting electricity: procedures in Micronesia, Fed. Sts. was 3 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Micronesia, Fed. Sts.?
- The highest recorded value was 3 number in 2009.
- What is the lowest getting electricity: procedures recorded in Micronesia, Fed. Sts.?
- The lowest recorded value was 3 number in 2009.
- How does Micronesia, Fed. Sts. rank for getting electricity: procedures?
- Micronesia, Fed. Sts. ranks 159th out of 186 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Micronesia, Fed. Sts.?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Micronesia, Fed. Sts. data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.