Guinea vs Vanuatu: Getting electricity: Procedures

Guinea
4 number
in 2019
Vanuatu
4 number
in 2019
Guinea rank
113th
Vanuatu rank
113th

Getting electricity: Procedures over time

  • Guinea
  • Vanuatu
012345200920142019

How they compare

Guinea currently reports 4 number against 4 number in Vanuatu, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Guinea ahead.

Guinea ranks 113th and Vanuatu ranks 113th of 186 countries.

Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Guinea Vanuatu Difference Ahead
2000s 5 number 4 number 1 number Guinea
2010s 4.2 number 4 number 0.2 number Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Guinea or Vanuatu?
Guinea, at 4 number against 4 number in Vanuatu as of 2019.
What is the difference in getting electricity: procedures between Guinea and Vanuatu?
0 number, with Guinea ahead.
How many years of comparable data are there for Guinea and Vanuatu?
11 years are reported by both, from 2009 to 2019.
How do Guinea and Vanuatu rank globally for getting electricity: procedures?
Guinea ranks 113th and Vanuatu ranks 113th of 186 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.