Getting electricity: Procedures in Guinea
Guinea: Getting electricity: Procedures was 4 number in 2019. ▼ Falling
Getting electricity: Procedures in Guinea, 2009–2019
Source: World Bank. Measured in number.
Analysis
The most recent figure for getting electricity: procedures in Guinea is 4 number, measured in 2019. That is the lowest value across all 11 years on record.
The figure is down 20.0% over ten years.
Over the whole period, getting electricity: procedures in Guinea peaked at 5 number in 2009 and was at its lowest, 4 number, in 2012.
That places Guinea 113th out of 186 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 11 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 5 number | 5 number | 5 number | 1 |
| 2010s | 4.2 number | 4 number | 5 number | 10 |
Countries ranked near Guinea
- 112 United States 4.8 number compare
- 113 Indonesia 4 number compare
- 113 Antigua and Barbuda 4 number compare
- 113 Bhutan 4 number compare
- 113 Burkina Faso 4 number compare
- 113 Cambodia 4 number compare
- 113 Cameroon 4 number compare
- 113 Croatia 4 number compare
- 113 Denmark 4 number compare
- 113 Ethiopia 4 number compare
- 113 Fiji 4 number compare
- 113 France 4 number compare
- 113 Ghana 4 number compare
- 113 Haiti 4 number compare
- 113 Iceland 4 number compare
- 113 Italy 4 number compare
- 113 Latvia 4 number compare
- 113 Lebanon 4 number compare
- 113 Liberia 4 number compare
- 113 Libya 4 number compare
- 113 Mali 4 number compare
- 113 Malta 4 number compare
- 113 Morocco 4 number compare
- 113 Mozambique 4 number compare
- 113 Niger 4 number compare
- 113 Norway 4 number compare
- 113 Papua New Guinea 4 number compare
- 113 Philippines 4 number compare
- 113 Poland 4 number compare
- 113 Qatar 4 number compare
- 113 Rwanda 4 number compare
- 113 Samoa 4 number compare
- 113 Sao Tome and Principe 4 number compare
- 113 Singapore 4 number compare
- 113 Solomon Islands 4 number compare
- 113 Saint Kitts and Nevis 4 number compare
- 113 Suriname 4 number compare
- 113 Tanzania 4 number compare
- 113 Trinidad and Tobago 4 number compare
- 113 Tunisia 4 number compare
- 113 Turkey 4 number compare
- 113 Uzbekistan 4 number compare
- 113 Vanuatu 4 number compare
- 113 Vietnam 4 number compare
- 113 Yemen 4 number compare
More private sector data for Guinea
- Merchandise trade 82.7% (2025)
- Food imports 26.6% (2016)
- Manufactures imports 58.5% (2016)
- Merchandise imports 8.34 billion current US$ (2025)
- Food exports 4.3% (2016)
- Manufactures exports 3.7% (2016)
- Merchandise exports 15.10 billion current US$ (2025)
- Commercial service exports 54.12 million current US$ (2024)
- Transport services 27.3% (2024)
- Computer, communications and other services 64.8% (2024)
Frequently asked questions
- What is getting electricity: procedures in Guinea?
- Getting electricity: procedures in Guinea was 4 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Guinea?
- The highest recorded value was 5 number in 2009.
- What is the lowest getting electricity: procedures recorded in Guinea?
- The lowest recorded value was 4 number in 2012.
- How does Guinea rank for getting electricity: procedures?
- Guinea ranks 113th out of 186 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Guinea?
- Over the last ten years it is down 20.0%. The long-run trend across the full record is falling.
- Where does this Guinea data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.