Angola vs North Africa: Time required to deal with construction permits
Angola
348 days
in 2012
North Africa
171.2 days
in 2012
Angola rank
4th
North Africa rank
6th
Time required to deal with construction permits over time
- Angola
- North Africa
How they compare
Angola currently reports 348 days against 171.2 days in North Africa, a difference of 176.8 days.
That makes Angola's figure about 2.0 times North Africa's.
Across all 8 years both countries report, Angola has been ahead every year.
Angola ranks 4th and North Africa ranks 6th of 50 countries.
Angola has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Angola | North Africa | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 321 days | 177.84 days | 143.16 days | Angola |
| 2010s | 330 days | 171.6 days | 158.4 days | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Angola or North Africa?
- Angola, at 348 days against 171.2 days in North Africa as of 2012.
- What is the difference in time required to deal with construction permits between Angola and North Africa?
- 176.8 days, with Angola ahead.
- How many years of comparable data are there for Angola and North Africa?
- 8 years are reported by both, from 2005 to 2012.
- How do Angola and North Africa rank globally for time required to deal with construction permits?
- Angola ranks 4th and North Africa ranks 6th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.