Time required to deal with construction permits (days) in Angola

Angola: Time required to deal with construction permits (days) was 348 days in 2012. ▬ Flat

Latest (2012)
348 days
Change on year
up 8.4%
World rank
4th
of 50 countries
All-time high
348 days
in 2012
All-time low
321 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Angola, 2005–2012

01002003002005200820122005: 321 days2006: 321 days2007: 321 days2008: 321 days2009: 321 days2010: 321 days2011: 321 days2012: 348 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Angola is 348 days, measured in 2012. That is the highest value across all 8 years on record.

That represents a change of up 8.4% on the previous year and up 8.4% over ten years.

That places Angola 4th out of 50 countries with data for 2012, putting it in the top 10%.

Time required to deal with construction permits (days) in Angola, year by year

Annual values for Time required to deal with construction permits (days) in Angola, 2005 to 2012.
Year days Change
2005 321 days —
2006 321 days +0.0%
2007 321 days +0.0%
2008 321 days +0.0%
2009 321 days +0.0%
2010 321 days +0.0%
2011 321 days +0.0%
2012 348 days +8.4%

Angola compared with similar countries

  • Angola's 348 days is above the median for lower middle income countries, which is 196.5 days, 1.8× the median. (24 countries reporting)
  • Angola's 348 days is above the median for Sub-Saharan Africa, which is 164 days, 2.1× the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 321 days 321 days 321 days 5
2010s 330 days 321 days 348 days 3

Countries ranked near Angola

  1. 1 Zimbabwe 614 days compare
  2. 2 Cote d'Ivoire 475 days compare
  3. 3 Mozambique 377 days compare
  4. 5 Lesotho 330 days compare
  5. 6 Niger 326 days compare
  6. 7 Togo 309 days compare

See the full ranking of 56 places →

More private sector data for Angola

All data for Angola →

Frequently asked questions

What is time required to deal with construction permits in Angola?
Time required to deal with construction permits in Angola was 348 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Angola?
The highest recorded value was 348 days in 2012.
What is the lowest time required to deal with construction permits recorded in Angola?
The lowest recorded value was 321 days in 2005.
How does Angola rank for time required to deal with construction permits?
Angola ranks 4th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Angola?
Over the last ten years it is up 8.4%. The long-run trend across the full record is flat.
Where does this Angola data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Angola. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/angola/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/angola/">Time required to deal with construction permits in Angola</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.