Time required to deal with construction permits in Angola
Angola: Time required to deal with construction permits was 348 days in 2012. ▬ Flat
Time required to deal with construction permits in Angola, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
The most recent figure for time required to deal with construction permits in Angola is 348 days, measured in 2012. That is the highest value across all 8 years on record.
That represents a change of up 8.4% on the previous year and up 8.4% over ten years.
That places Angola 4th out of 50 countries with data for 2012, putting it in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 321 days | 321 days | 321 days | 5 |
| 2010s | 330 days | 321 days | 348 days | 3 |
Countries ranked near Angola
More private sector data for Angola
- Merchandise trade 38.8% (2025)
- Food imports 15.7% (2024)
- Manufactures imports 62.6% (2024)
- Merchandise imports 14.96 billion current US$ (2025)
- Food exports 0.4% (2024)
- Manufactures exports 1.1% (2024)
- Merchandise exports 32.49 billion current US$ (2025)
- Commercial service exports 116.50 million current US$ (2025)
- Transport services 40.5% (2025)
- Computer, communications and other services 35.6% (2025)
Frequently asked questions
- What is time required to deal with construction permits in Angola?
- Time required to deal with construction permits in Angola was 348 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Angola?
- The highest recorded value was 348 days in 2012.
- What is the lowest time required to deal with construction permits recorded in Angola?
- The lowest recorded value was 321 days in 2005.
- How does Angola rank for time required to deal with construction permits?
- Angola ranks 4th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Angola?
- Over the last ten years it is up 8.4%. The long-run trend across the full record is flat.
- Where does this Angola data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.