Cabo Verde vs Uganda: Time required to deal with construction permits
Cabo Verde
122 days
in 2012
Uganda
125 days
in 2012
Cabo Verde rank
40th
Uganda rank
38th
Time required to deal with construction permits over time
- Cabo Verde
- Uganda
How they compare
Uganda currently reports 125 days against 122 days in Cabo Verde, a difference of 3 days.
Across all 8 years both countries report, Uganda has been ahead every year.
Cabo Verde ranks 40th and Uganda ranks 38th of 50 countries.
Uganda has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cabo Verde | Uganda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 122 days | 129 days | 7 days | Uganda |
| 2010s | 122 days | 125 days | 3 days | Uganda |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cabo Verde or Uganda?
- Uganda, at 125 days against 122 days in Cabo Verde as of 2012.
- What is the difference in time required to deal with construction permits between Cabo Verde and Uganda?
- 3 days, with Uganda ahead.
- How many years of comparable data are there for Cabo Verde and Uganda?
- 8 years are reported by both, from 2005 to 2012.
- How do Cabo Verde and Uganda rank globally for time required to deal with construction permits?
- Cabo Verde ranks 40th and Uganda ranks 38th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.