Time required to deal with construction permits in Cape Verde
Cape Verde: Time required to deal with construction permits was 122 days in 2012. ▬ Flat
Time required to deal with construction permits in Cape Verde, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
Cape Verde recorded 122 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
Cape Verde ranks 40th of 50 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 122 days | 122 days | 122 days | 5 |
| 2010s | 122 days | 122 days | 122 days | 3 |
Countries ranked near Cape Verde
- 37 Seychelles 126 days compare
- 38 Kenya 125 days compare
- 38 Uganda 125 days compare
- 41 Sao Tome and Principe 118 days compare
- 42 Democratic Republic of Congo 117 days compare
- 43 Burundi 99 days compare
More private sector data for Cape Verde
- Merchandise trade 70.0% (2025)
- Food imports 32.6% (2024)
- Manufactures imports 50.8% (2024)
- Merchandise imports 2.04 billion current US$ (2025)
- Food exports 86.4% (2024)
- Manufactures exports 13.6% (2024)
- Merchandise exports 96.00 million current US$ (2025)
- Commercial service exports 916.28 million current US$ (2025)
- Transport services 31.7% (2025)
- Computer, communications and other services 34.6% (2025)
Frequently asked questions
- What is time required to deal with construction permits in Cape Verde?
- Time required to deal with construction permits in Cape Verde was 122 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Cape Verde?
- The highest recorded value was 122 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Cape Verde?
- The lowest recorded value was 122 days in 2005.
- How does Cape Verde rank for time required to deal with construction permits?
- Cape Verde ranks 40th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Cape Verde?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Cape Verde data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.