Cameroon vs Mauritius: Time required to deal with construction permits
Cameroon
147 days
in 2012
Mauritius
143 days
in 2012
Cameroon rank
29th
Mauritius rank
31st
Time required to deal with construction permits over time
- Cameroon
- Mauritius
How they compare
Cameroon currently reports 147 days against 143 days in Mauritius, a difference of 4 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mauritius ahead.
Cameroon ranks 29th and Mauritius ranks 31st of 50 countries.
Across the 2 decades both report, Cameroon averaged higher in 1 and Mauritius in 1.
Head to head by decade
| Decade | Cameroon | Mauritius | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 159 days | 159.8 days | 0.8 days | Mauritius |
| 2010s | 147 days | 143 days | 4 days | Cameroon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cameroon or Mauritius?
- Cameroon, at 147 days against 143 days in Mauritius as of 2012.
- What is the difference in time required to deal with construction permits between Cameroon and Mauritius?
- 4 days, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Mauritius?
- 8 years are reported by both, from 2005 to 2012.
- How do Cameroon and Mauritius rank globally for time required to deal with construction permits?
- Cameroon ranks 29th and Mauritius ranks 31st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.