Time required to deal with construction permits in Cameroon

Cameroon: Time required to deal with construction permits was 147 days in 2012. ▼ Falling

Latest (2012)
147 days
Change on year
unchanged
World rank
29th
of 50 countries
All-time high
168 days
in 2005
All-time low
147 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Cameroon, 2005–2012

0501001502005200820122005: 168 days2006: 168 days2007: 153 days2008: 153 days2009: 153 days2010: 147 days2011: 147 days2012: 147 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Cameroon is 147 days, measured in 2012. That is the lowest value across all 8 years on record.

That represents a change of down 12.5% over ten years.

That places Cameroon 29th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 159 days 153 days 168 days 5
2010s 147 days 147 days 147 days 3

Countries ranked near Cameroon

  1. 26 Rwanda 164 days compare
  2. 27 Guinea-Bissau 163 days compare
  3. 28 Chad 154 days compare
  4. 30 Botswana 145 days compare
  5. 31 Comoros 143 days compare
  6. 31 Gambia 143 days compare
  7. 31 Mauritius 143 days compare

See the full ranking of 56 places →

More private sector data for Cameroon

All data for Cameroon →

Frequently asked questions

What is time required to deal with construction permits in Cameroon?
Time required to deal with construction permits in Cameroon was 147 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Cameroon?
The highest recorded value was 168 days in 2005.
What is the lowest time required to deal with construction permits recorded in Cameroon?
The lowest recorded value was 147 days in 2010.
How does Cameroon rank for time required to deal with construction permits?
Cameroon ranks 29th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Cameroon?
Over the last ten years it is down 12.5%. The long-run trend across the full record is falling.
Where does this Cameroon data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.