Central African Republic vs Guinea: Time required to deal with construction permits

Central African Republic
203 days
in 2012
Guinea
197 days
in 2012
Central African Republic rank
17th
Guinea rank
20th

Time required to deal with construction permits over time

  • Central African Republic
  • Guinea
050100150200200520082012

How they compare

Central African Republic currently reports 203 days against 197 days in Guinea, a difference of 6 days.

Across all 8 years both countries report, Central African Republic has been ahead every year.

Central African Republic ranks 17th and Guinea ranks 20th of 50 countries.

Central African Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Central African Republic Guinea Difference Ahead
2000s 203 days 197 days 6 days Central African Republic
2010s 203 days 197 days 6 days Central African Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Central African Republic or Guinea?
Central African Republic, at 203 days against 197 days in Guinea as of 2012.
What is the difference in time required to deal with construction permits between Central African Republic and Guinea?
6 days, with Central African Republic ahead.
How many years of comparable data are there for Central African Republic and Guinea?
8 years are reported by both, from 2005 to 2012.
How do Central African Republic and Guinea rank globally for time required to deal with construction permits?
Central African Republic ranks 17th and Guinea ranks 20th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Central African Republic vs Guinea: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/central-african-republic/guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/central-african-republic/guinea/">Central African Republic vs Guinea: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.