Time required to deal with construction permits in Guinea

Guinea: Time required to deal with construction permits was 197 days in 2012. ▬ Flat

Latest (2012)
197 days
Change on year
unchanged
World rank
20th
of 50 countries
All-time high
197 days
in 2005
All-time low
197 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Guinea, 2005–2012

0501001502002005200820122005: 197 days2006: 197 days2007: 197 days2008: 197 days2009: 197 days2010: 197 days2011: 197 days2012: 197 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Guinea is 197 days, measured in 2012. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

That places Guinea 20th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 197 days 197 days 197 days 5
2010s 197 days 197 days 197 days 3

Countries ranked near Guinea

  1. 17 Central African Republic 203 days compare
  2. 18 Congo 201 days compare
  3. 19 Malawi 200 days compare
  4. 21 Zambia 196 days compare
  5. 22 Mali 179 days compare
  6. 23 Madagascar 172 days compare

See the full ranking of 56 places →

More private sector data for Guinea

All data for Guinea →

Frequently asked questions

What is time required to deal with construction permits in Guinea?
Time required to deal with construction permits in Guinea was 197 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Guinea?
The highest recorded value was 197 days in 2005.
What is the lowest time required to deal with construction permits recorded in Guinea?
The lowest recorded value was 197 days in 2005.
How does Guinea rank for time required to deal with construction permits?
Guinea ranks 20th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Guinea data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.